Give your broken lid a second life.
Assembly instructions:
- Heat the bolt before screwing it in for easier instal and for long term protection from unscrew.
Print setting recomendations:
- ABS, ASA
- 0.2mm layer
- 15-20% infill
Tags
The author marked this model as their own original creation.